Method Prefab Cabin
Firm:
Balance Associates, Architects
To design a factory built prefab cabin targeting LEED for homes 2.0 Gold. The cabin was designed as interchangeable modules with multiple configurations and varying levels of finish options. Sustainable building materials and practices were integrated into the design process from the original meetings with clients and consultants.
View Images